Extensions · Loft conversions · New builds

Contemporary kitchen extension with island unit, built-in storage, and open-plan living area featuring modern cabinetry and skylights

MoreSpace Sussex Ltd

Rsj in Sevenoaks

We supply and install RSJs according to structural engineer's calculations, ensuring full building control sign-off in the process. Our team is ready to assist you with RSJ needs in Sevenoaks and the surrounding area.

  • On-time, on-budget delivery
  • Clear communication and a fast response
  • One contractor from groundworks to the keys

See our work in person Visit a finished project and talk to past clients

Request Your Free Consultation

Who Needs Structural Steel Work

Opening Up Ground Floor

If you’re looking to take down a load-bearing wall to create a spacious kitchen and living area, an RSJ in Sevenoaks is essential for structural integrity. Removing that wall without adequate steel support is something Building Control won’t approve for good reason-it's a critical structural element. An RSJ will take over that role, supporting the load from the floors above through the new opening. We size and install the beam per the structural engineer's calculations to ensure proper execution right from the beginning.

Connecting an Extension

Where a new extension meets the existing structure, an RSJ is often needed to bridge the opening effectively-particularly common in single-storey rear and side-return extensions where part or all of the original back wall is removed. The RSJ carries the upper load while the new area below is opened up, and we ensure that this crucial connection is inspected by Building Control before any finishes are applied. Getting it right during this phase prevents future issues like cracking or movement.

Loft and Upper Floor Work

Installing an RSJ is standard in many loft conversions, providing the necessary support for new floor joists while redistributing roof loads. In projects like hip to gable or dormer conversions, existing roof structures can significantly change, and an RSJ or steel frame is required to safely bear these new loads. We collaborate with the structural engineer’s specifications throughout this process, using temporary supports while the RSJ is installed, ensuring inspections for Building Control occur at all crucial stages. Although the RSJ remains hidden after completion, its structural role is pivotal for the rest of the work.

Contemporary kitchen extension with dark cabinetry, white counters, and full-width patio doors opening to garden

What RSJ Installation Covers

Kitchen extension with modern open-plan design, dark island, dining table, and sliding glass doors to garden

Structural Steel Supply

RSJ installation in Sevenoaks includes providing and fitting rolled steel joists where load-bearing walls need removal or new openings created. Every RSJ we install is dimensioned according to the structural engineer’s calculations, ensuring it can carry precisely what is necessary, eliminating guesswork. We manage temporary propping throughout the process to maintain safety while the RSJ is installed, and we include building control sign-off before any work is obscured.

Making Good Afterwards

After the RSJ is in and inspected, our work continues with all necessary finishing touches-this means patching, plastering, and ensuring the area fits seamlessly with the existing structure. There’s no need to hand off to another contractor; we ensure everything from the structural work to the finish is handled smoothly, whether the RSJ is linking an extension or creating an open-plan space.

Advantages of One Team Throughout

  • No Coordination Gaps

    When our team installs the RSJ and continues with subsequent work, nothing gets overlooked. The structural elements connect directly to the next phase without waiting on another contractor.

  • Structural Work in Context

    We understand how the RSJ integrates into the overall project-whether it’s an extension, loft conversion, or a new ground floor layout. This knowledge allows us to position the beam accurately from the outset, ensuring that the wider construction plans accommodate it properly.

  • Building Control Handled

    Since RSJ installation requires building control approval before covering the beam, we take responsibility for that process as part of our work. You won’t have to worry about who schedules the inspection or what to do if adjustments are necessary.

  • Temporary Propping Done Right

    Effective temporary propping is critical while fitting the RSJ. If it’s mishandled, the structure could be at risk. Because we oversee the entire workflow, the propping remains secure for as long as necessary, relieving any pressure from other trades waiting to start.

  • Making Good Included

    Following the RSJ installation and approval, our team will restore any openings, plasterwork, and surfaces, ensuring everything ties in nicely with the rest of the build. You won't be left with a solid beam and unpolished finishes requiring attention from others.

Rendered single-storey extension with large black-framed windows, soffit downlights and a landscaped patio

Protecting Daily Living During Installation

Modern kitchen extension with fitted gray cabinets, island and open dining area

Managing Dust and Debris

Fine masonry dust travels everywhere. When setting up an Rsj in Sevenoaks, we seal doorways with heavy polythene screens and tape floor protection straight across hardwood or carpets before lifting any masonry. Heavy timber boards safeguard threshold tiles from dropped scaffold clamps. A dedicated negative-pressure extraction fan vents stone dust through a cracked window instead of letting it drift into your pantry.

Keeping Everyday Services Running Smoothly

Plumbing stacks and electrical circuits frequently hide inside masonry partitions earmarked for removal. We isolate and re-route heating runs or lighting cables before bringing any steelwork through your hallway, preventing cold radiators or dark corridors upstairs while structural changes take place. In older homes, copper water pipes often run directly through joist pockets where steel bearings need to sit, requiring temporary bypass loops to maintain fresh water supplies for cooking and washing throughout the noisy structural phase.

Process From Calculations to Completion

  1. Structural Engineer Calculations

    From the beginning, we collaborate with a structural engineer to determine the correct size, specifications, and bearing positions of the RSJ based upon the actual span and load requirements for your project.

  2. Temporary Propping Installed

    Before we touch any masonry, we set up temporary propping to securely hold the load throughout the installation. This protects the structure above and maintains safety on site during the RSJ fitting process.

  3. Opening Up and Beam Placement

    We methodically remove the masonry to create the opening and then lift and position the RSJ onto its padstones or steel columns at both ends. The installation adheres precisely to the engineer’s drawings, without shortcuts regarding bearing lengths or height.

  4. Building Control Inspection

    We arrange the Building Control inspection during the structural phase, before any materials are concealed. The RSJ and its supports are officially signed off at the site, providing you with documentation that proves compliance with Building Regulations.

  5. Making Good and Finishing

    Once the RSJ has been approved, we restore all affected masonry, plaster, and finishes. The structural steel is integrated seamlessly, allowing the space to be ready for the next stages in construction.

Working Around Existing Domestic Services

Concealed Pipework Collisions

Central heating pipes love hiding inside cavities. When dropping an Rsj in Sevenoaks into position, unexpected soil pipes or gas feeds tucked between ceiling joists can halt work unless surveyed in advance. We notch timber packers rather than structural steel flanges to keep clearances intact around existing copper runs. Lifting floorboards on the level above reveals every hidden run before steel arrives at your front door.

Drainage Falls and Waste Routing

Upstairs bathroom waste pipes need a continuous downhill fall to prevent blockages. Inserting a deep steel girder directly beneath floor joists can trap low-hanging waste lines, leaving no pitch for water to drain away properly toward the external stack. We review these pipe levels before ordering padstones, sometimes welding web pass-through sleeves or lowering the bearing pockets slightly so bathroom wastewater discharges freely without boxing in unsightly drops below the new ceiling line.

Modern kitchen extension with open-plan dining, black cabinetry, and garden doors

Seasonal Weather and Site Access

Contemporary kitchen extension with island unit, built-in storage, and open-plan living area featuring modern cabinetry and skylights

Winter Bearing Mortars

Freezing air ruins wet mortar. Dense concrete padstones supporting an Rsj in Sevenoaks require frost-free temperatures to cure correctly, so we shelter open exterior masonry openings during frosty mornings. Fast-setting additives help mortar reach full bearing capacity before heavy steel sections touch it. Damp cold also slows drying times inside unheated rooms.

Managing Narrow Garden Access

Tight side passages make carrying long steel beams tricky. Twisting a long steel beam around bay windows, shared boundary fences or narrow porch canopies requires manual lifting equipment like genie hoists and heavy-duty dollies instead of cranes. Muddy garden paths in wet autumn months get covered in interlocking plastic trackway mats, stopping wheelbarrows from turning your lawn into deep ruts while moving masonry rubble out to the front driveway skips.

Summer Heat and Cavity Breezes

Dry weather brings sudden drafts. Removing external masonry skins during midsummer lets warm gusts sweep through open floor voids, blowing dry insulation beads into adjoining bedrooms unless barriers are erected behind skirtings. We secure fire-rated expanding foam and draft seals around joist ends right away, keeping your living spaces comfortable while external cavity trays and wall ties are rebuilt around the newly seated steel flange.

Let's Talk About Your Structural Project

Done Right From the Start

When considering opening a ground floor, taking down a load-bearing wall, or linking a new extension to your property, RSJ installation is critical. Every RSJ we install is correctly sized and specified to a structural engineer’s calculations before any propping is in place. We manage the work with full temporary propping throughout to ensure proper support for the structure during each phase.

One Team, No Gaps

Since we manage the structural work alongside the full project, you won’t have to wait for a separate contractor to progress. Our team oversees the RSJ installation, coordinates building control inspections, and completes all surrounding work once the beam is signed off. With 35 years of experience, we know what’s necessary to execute the structural work effectively while maintaining momentum throughout the project.

Local contact

Contact in Sevenoaks

We operate locally in Sevenoaks and nearby areas like Tonbridge and Tunbridge Wells. Reach out by phone to discuss your RSJ needs or to get a free estimate.

approx. 25 milesDistance from our base · Haywards Heath

Call us+44 7351 026409Email usmorespacesussex@yahoo.com

We serve your areaSevenoaks and the surroundings

The Google map loads after you accept marketing cookies.

Request Your Free Consultation

What Clients Say

01

“Very satisfied with the service! Excellent communication, clean workmanship, and everything completed professionally. Highly recommended!”

Maksymilian Mazur

Review from Google

What we build

Our Building Services

Project Results

Builders at MoreSpace Sussex Ltd deliver finished, practical living spaces tailored to each client's real needs.

Where We Operate

Builders from MoreSpace Sussex Ltd operate within a 40 km radius of Haywards Heath for all projects, from loft conversions and extensions to complete new builds.

Frequently asked questions - Rsj