Extensions · Loft conversions · New builds

Contemporary kitchen extension with island unit, built-in storage, and open-plan living area featuring modern cabinetry and skylights

MoreSpace Sussex Ltd

Rsj in Caterham

We supply and install RSJs in Caterham to meet structural engineer's calculations, ensuring full building control sign-off at every stage.

  • On-time, on-budget delivery
  • Clear communication and a fast response
  • One contractor from groundworks to the keys

See our work in person Visit a finished project and talk to past clients

Request Your Free Consultation

Who Needs Structural Steel Work

Opening Up Ground Floor

If you're considering knocking through a load-bearing wall in your home to create an open-plan kitchen and living area in Caterham, an RSJ is essential for structural integrity. Removing a load-bearing wall without proper steel support isn’t approved by Building Control, and it makes sense-those walls have vital roles. An RSJ takes on that load, distributing it safely across the new opening. We carefully size and install the beam according to the structural engineer's specifications to ensure everything's done right the first time.

Connecting an Extension

When adding an extension to your house in Caterham, connecting the new structure to the existing one often necessitates an RSJ. This is especially the case with single-storey rear extensions, where the original rear wall might be partially or completely removed. The RSJ bridges the gap, carrying the load above while opening up the space below, and all this gets a thorough check by Building Control before the final finishes are applied. Getting this part correct prevents potential cracking and movement in the future.

Loft and Upper Floor Work

RSJ installation regularly forms a critical part of loft conversions in Caterham, needed to support new floor joists and redistribute loads from the roof. In hip-to-gable projects or dormer conversions, altering the roof structure often requires an RSJ or a steel frame to safely manage the new loads. We follow the structural engineer's specifications closely throughout the process, with temporary propping implemented while the beam is fitted and Building Control inspections are performed. Once finished, the RSJ remains hidden, yet it is the foundation on which the integrity of your conversion relies.

Contemporary kitchen extension with dark cabinetry, white counters, and full-width patio doors opening to garden

Preparing Your Living Space

Modern kitchen extension with open-plan dining, black cabinetry, and garden doors

Clearing Access Paths

Moving heavy metal takes room. We carry long steel sections straight through front doorways or side passages, so you need to move coat racks, delicate hallway mirrors, and loose shoe racks outside the work corridor. When booking an RSJ Caterham homeowners often overlook ceiling heights in tight porches, which causes unnecessary scuffs on skirting boards when the team tries to pivot long metal components into your front lounge.

Managing Dust Drift

Masonry saws create fine grit. Mortar particles float upstairs into bedrooms through tiny door gaps unless you hang heavy polythene sheets and seal wardrobe doors with low-tack masking tape well before steel elements arrive on site. Take all soft furnishings, open fruit bowls, and kitchen appliances out of adjacent areas, or wrap them thoroughly in dense plastic dust sheets because masonry grit finds its way into every small toaster slot or upholstery seam.

Advantages of One Team Throughout

  • No Coordination Gaps

    Having the same team install the RSJ and manage subsequent work means nothing slips through the cracks. The structural components link directly to subsequent stages, eliminating delays waiting for other contractors.

  • Structural Work in Context

    Our crew understands the RSJ's role within the entire project scope, whether it involves a house extension, a loft conversion, or opening up the ground floor. This insight ensures the beam is positioned accurately from the outset, with all subsequent work designed around it.

  • Building Control Handled

    Getting your RSJ installation approved by Building Control before its coverage is vital, and we manage this crucial aspect seamlessly. You won't have to worry about arranging inspections or making adjustments if something is amiss.

  • Temporary Propping Done Right

    Correctly implementing temporary propping during RSJ installation is critical, as any mismanagement can jeopardize the structure. Because we oversee the entire workflow, the propping remains in place for as long as necessary, without any pressure from other trades waiting to begin their work.

  • Making Good Included

    After the RSJ is installed and signed off, our team takes care of the wall openings, plasterwork, and finishes. You won’t be left with a well-supported beam and rough edges that someone else needs to address.

Rendered single-storey extension with large black-framed windows, soffit downlights and a landscaped patio

Handling Existing Pipes And Wiring

Kitchen extension with modern open-plan design, dark island, dining table, and sliding glass doors to garden

Concealed Utility Drops

Old partition walls hide surprises. Chasing out brickwork frequently exposes copper heating runs, grey twin-and-earth cables, or lead waste pipes running directly through where steel beams need to rest flat. Before placing an RSJ Caterham builders must strip back the plaster skin to let plumbers isolate old circuits, reroute cold feeds into ceiling voids, and drop electrical runs away from raw metal surfaces to avoid accidental pinching.

Maintaining Structural Ventilation Paths

Solid walls need to breathe. Masonry distributes natural air movement across old cavities, but boxing in structural metal with thick foil-backed plasterboard can inadvertently trap moisture against cold outer leaves. We check subfloor air bricks below suspended timber joists, repositioning plastic ducting around padstones so rising ground moisture never pools beneath your lounge floorboards behind newly plastered bulkheads.

Process From Calculations to Completion

  1. Structural Engineer Calculations

    We begin our work with a structural engineer to determine the right RSJ size, specifications, and bearing locations based on the specific span and load needs of your project.

  2. Temporary Propping Installed

    Before we touch any masonry, we set up temporary propping to safely carry the load while work occurs. This protects the upper structure and keeps the job site secure during the RSJ installation.

  3. Opening Up and Beam Placement

    We precisely remove masonry to create the new opening, then lift and place the RSJ onto its designated padstones or steel columns. The beam is set to the engineer's drawings with no shortcuts on bearing lengths or levels.

  4. Building Control Inspection

    We coordinate the Building Control inspection during the structural phase, prior to closing up or plastering over. The RSJ and its supports get approved on-site, giving you peace of mind that everything adheres to Building Regulations.

  5. Making Good and Finishing

    After the RSJ receives sign-off, we restore the surrounding masonry, plastering, and any affected finishes. The structural steel integrates with the building's fabric, and we return the space fully prepared for the next construction phase.

Results the Client Can Rely On

Structural Integrity First

When an RSJ is installed correctly, the outcome is clear: no cracking above the opening, stable floors above, and no structural problems surfacing later on. Each RSJ we fit is sized according to the structural engineer's calculations, installed with all necessary temporary propping, and signed off by Building Control before any closure. This verification isn't just a formality; it confirms the beam is fulfilling its intended purpose.

One Team, Full Scope

Since we manage the structural work within the greater project scope, the RSJ installation proceeds without hiccups. There are no delays waiting for different structural contractors, no gaps in communication, and no risk of leaving finishing tasks to others. From when the wall is taken down to when the new space is plastered and completed, the same crew oversees every step-we know how to synchronize the tasks after 35 years in the business.

Modern kitchen extension with fitted gray cabinets, island and open dining area

Sensible Contract And Paperwork Checks

Contemporary kitchen extension with island unit, built-in storage, and open-plan living area featuring modern cabinetry and skylights

Notice Requirements Matter

Party walls require written clarity. You must confirm whether adjoining owners share the targeted brick chimney breast or flank boundary wall well before steel delivery lorries pull up outside the property. With every domestic RSJ Caterham properties often feature shared party structures, so you should check paperwork thoroughly to ensure adjoining neighbours have signed proper consent notices, avoiding sudden stop notices from surveyor representatives.

Scope Of Waste Clearance

Rubbish piles up very fast. Heavy masonry chunks, crushed lime mortar, and broken timber studs quickly fill open skips parked along narrow residential driveways. Always verify whether your written agreement covers haulage licences, council permits for highway skip placement, and complete site clearance down to bare subfloors, because leaving several tonnes of dense concrete rubble on your front lawn creates massive extra hauling costs later.

Padstone Curing Periods

Patience prevents serious ceiling cracks. Dense concrete blocks poured into supporting masonry piers require adequate curing time before taking thousands of pounds of dead steel load from overhead floors. Never rush your contractor to knock down temporary jacks early just to speed up painter visits, because premature loading crushes uncured mortar beds and forces upper bedroom door frames permanently out of square.

Let's Talk About Your Structural Project

Done Right From the Start

If you're planning to open up a ground floor, remove a load-bearing wall, or integrate a new extension into your home, RSJ installation is crucial. Each RSJ we fit is tailored to the structural engineer's calculations before any props are in place. We carry out the job with full temporary propping throughout, ensuring the upper structure remains correctly supported at each step.

One Team, No Gaps

By having our team manage the structural work alongside the rest of the project, there’s no waiting on a different contractor's schedule. We coordinate the RSJ installation, organize the Building Control inspection, and restore all adjacent materials after the beam is approved. With three and a half decades of experience, we understand what's necessary to execute the structural work correctly and maintain project momentum.

Local contact

Contact in Caterham

We work locally within Caterham and surrounding areas, ensuring prompt service. Contact us via phone for a quick response, free estimates, and site visits to discuss your RSJ needs.

approx. 25 milesDistance from our base · Haywards Heath

Call us+44 7351 026409Email usmorespacesussex@yahoo.com

We serve your areaCaterham and the surroundings

The Google map loads after you accept marketing cookies.

Request Your Free Consultation

What Clients Say

01

“Very satisfied with the service! Excellent communication, clean workmanship, and everything completed professionally. Highly recommended!”

Maksymilian Mazur

Review from Google

What we build

Our Building Services

Project Results

Builders at MoreSpace Sussex Ltd deliver finished, practical living spaces tailored to each client's real needs.

Where We Operate

Builders from MoreSpace Sussex Ltd operate within a 40 km radius of Haywards Heath for all projects, from loft conversions and extensions to complete new builds.

Frequently asked questions - Rsj