Rsj in Lewes

We supply and install RSJs in Lewes according to the specifications provided by structural engineers, ensuring that complete building control sign-off is included.

  • On-time, on-budget delivery
  • Clear communication and a fast response
  • One contractor from groundworks to the keys

See our work in person Visit a finished project and talk to past clients

Request Your Free Consultation

Who Needs Structural Steel Work

Opening Up Ground Floor

If you're looking to break through a load-bearing wall to create an open-plan kitchen and living area, an RSJ in Lewes is essential for structural support. Without proper steel reinforcement, Building Control won't approve the modification, and understandably so-every wall serves a purpose. The RSJ takes on the load, supporting the weight of the floor or roof above the new opening. We ensure the beam is appropriately sized and installed according to the structural engineer's calculations, so everything is done correctly from the outset.

Connecting an Extension

When adding an extension to an existing home, often an RSJ in Lewes is needed to bridge the gap and properly integrate the new structure with the old. This is especially true for single-storey extensions where the rear wall is partially or completely removed. The RSJ is responsible for carrying the load above while maximizing the usable space below, and Building Control inspects the connection before any plastering occurs. Getting this detail right is crucial to prevent future issues like cracking or shifting.

Loft and Upper Floor Work

RSJ installation plays a key role in many loft conversions, where structural steel supports are necessary to maintain new floor joists and redistribute weight from the roof. In a hip-to-gable or dormer conversion, the roof structure changes significantly, and an RSJ or steel framework is needed to ensure safe load-bearing. We adhere to the specifications set out by structural engineers, utilizing temporary supports during the installation process while coordinating with Building Control to conduct necessary inspections. Although the RSJ remains concealed after the job is completed, its structural integrity is fundamental to the overall success of the loft conversion.

Modern kitchen extension with open-plan dining, black cabinetry, and garden doors

Preparing Your Living Space

Contemporary kitchen extension with dark cabinetry, white counters, and full-width patio doors opening to garden

Clearing Access Paths

Heavy steel requires clear pathways. Fitting an RSJ in Lewes means moving hefty metal through your front hallway or side gate without scraping woodwork. When we carry steel through domestic halls, even narrow turns can strip skirting boards or wallpaper. We always ask you to box up family heirlooms, remove hall carpets, and strip coat hooks from doorframes before unloading starts. Heavy boots leave scuffs.

Managing Masonry Dust

Slicing through blockwork creates gritty powder. Fine mortar dust infiltrates every tiny opening, settling inside closed kitchen cupboards, toaster slots, and delicate stereo equipment. While cutting masonry, we seal surrounding living zones using taped plastic sheeting, but vibrations still travel straight up through floor timbers into bedroom wardrobes above. Sealing clothes bags upstairs beforehand prevents annoying wash cycles. It saves hours of frantic dusting later.

Advantages of One Team Throughout

  • No Coordination Gaps

    When our team handles the RSJ installation and continues with the rest of the construction, nothing slips through the cracks. The structural work seamlessly connects to subsequent project phases without delays caused by different contractors.

  • Structural Work in Context

    We understand the role of the RSJ in the greater scope of your project, whether it involves a house extension, loft conversion, or opening up a ground floor. With this awareness, we ensure the beam is positioned correctly from day one, allowing us to plan the rest of the build efficiently around it.

  • Building Control Handled

    For RSJ installation, obtaining building control sign-off before covering the beam is critical, and we manage this as part of the overall job. You won't be left in the dark about who is accountable for inspections or how to handle any adjustments that may arise.

  • Temporary Propping Done Right

    Effective temporary propping is crucial during RSJ installation, and doing it incorrectly can jeopardize the structure. By managing the full workflow, we ensure the props remain in place for exactly as long as necessary, without pressure to rush from other trades.

  • Making Good Included

    Once the RSJ is installed and approved, our team takes care of the wall openings, plastering, and finishes. You won't be left with just a structurally sound beam and unfinished work that requires a separate contractor to complete.

Rendered single-storey extension with large black-framed windows, soffit downlights and a landscaped patio

Structural Problems We Solve Properly

Modern kitchen extension with fitted gray cabinets, island and open dining area

Opening Up Load-Bearing Walls

When you remove a ground-floor wall to create an open-plan living area or connect an extension, an RSJ in Lewes takes on the essential role of supporting the load above. Every RSJ we install is appropriately sized according to a structural engineer's calculations, with proper temporary supports in place throughout the process to maintain safety. Prior to covering anything, Building Control inspects the installation to verify there's no ambiguity about what’s behind the plaster.

Connecting Extensions to Existing Structure

Attaching a new extension to the original structure typically requires structural steelwork to ensure a long-lasting connection. We oversee the entire process-propping, RSJ installation, and restoring the surrounding elements-so the integration between old and new is both solid and aesthetically pleasing. With over three decades of experience in house extensions and structural modifications throughout Sussex, we understand the nuances of these connections and execute them meticulously.

Process From Calculations to Completion

  1. Structural Engineer Calculations

    From the beginning, we collaborate with a structural engineer to determine the correct RSJ dimensions, specifications, and bearing points based on the load requirements and spans of your project.

  2. Temporary Propping Installed

    Before any brickwork is disturbed, we set up temporary propping to securely support loads throughout the project. This safeguards the structure above and maintains safety at the job site as we move forward with the RSJ installation.

  3. Opening Up and Beam Placement

    We carefully take down the masonry to create the new opening, followed by lifting and positioning the RSJ onto its padstones or steel columns at both ends. The beam is precisely set according to the detailed engineer's plan, leaving no room for shortcuts on the lengths or levels of the bearings.

  4. Building Control Inspection

    We take care of arranging the Building Control inspection at the structural stage before any of the work is covered up or plastered. The RSJ and its supports receive sign-off on-site, providing you with a documented confirmation that the work complies with Building Regulations.

  5. Making Good and Finishing

    Once the RSJ is signed off, we restore the surrounding masonry, plastering, and finishes. The structural steel integrates seamlessly into the building's framework, and the area is ready for the next phase of your project.

Protecting Existing Pipes And Cables

Concealed Circuit Risks

Old internal partitions hide live wiring. Before hoisting an RSJ in Lewes properties, our team tracks every hidden power line running down inside the hollow plaster. An unrecorded cooker ring main often cuts straight across your lintel bearing zone, requiring an electrician to isolate switches before steel resting pads get bedded on fresh mortar. Live feeds cannot touch raw iron. Safety comes first.

Rerouting Central Heating

Plumbing lines love ceiling voids. Copper feeds feeding upstairs bathroom towel rails usually nestle right where your upper beam flange sits flush against old joists. If pipes rest against uninsulated cold structural metal, condensation forms quickly and drips silently into fresh plasterboard beneath. We notch joists cleanly and sleeve every copper run with thick foam jackets so thermal movement never rubs metal thin over decades of boiler cycles.

Kitchen extension with modern open-plan design, dark island, dining table, and sliding glass doors to garden

Seasonal Influences On Structural Alterations

Contemporary kitchen extension with island unit, built-in storage, and open-plan living area featuring modern cabinetry and skylights

Winter Mortar Curing

Cold snaps slow mortar strength. Installing an RSJ in Lewes during freezing months demands watchful care around padstone bed depth. When temperature drops toward freezing, wet compound under bearings cannot support full steel tonnage until set firm. We monitor ambient moisture closely. Premature loading cracks fresh masonry joints.

Managing Wet Weather

Rain complicates external wall knock-throughs. If an autumn downpour drenches opened brickwork before the lintel gets boxed, moisture creeps across steel flanges and stains ceiling plaster. We rig heavy tarpaulins outside and double-check lead flashing positions before removing masonry skin so rainwater diverts clear away into ground gullies.

High Summer Working

Heat accelerates curing times dramatically. Fast-drying mortar beneath bearing plates can dry out before levelling wedges settle properly into position. On baking midsummer days, we wet porous masonry sponges first so dry brick does not suck essential moisture straight out of wet padstone mixes. Proper hydration keeps the bed solid.

Let's Talk About Your Structural Project

Done Right From the Start

If you’re considering removing a load-bearing wall, opening your ground floor, or connecting an extension to your existing house, RSJ installation is not a task to skimp on. Each RSJ we fit is selected and sized following the structural engineer's specifications before any temporary supports are set up. Full temporary propping is in place during the entire process, ensuring that the structure overhead is securely supported each step of the way.

One Team, No Gaps

Because we take care of both the structural elements and the remaining build, you don't have to wait for a separate steel contractor before progressing. We manage the RSJ installation, handle Building Control inspections, and ensure the surrounding areas are finished neatly once the beam is signed off. With more than thirty-five years of experience, we know exactly what's required to accomplish the structural work properly and keep the entirety of the project on schedule.

Local contact

Contact in Lewes

We operate in Lewes and the nearby areas, providing RSJ services like installations and assessments. Reach out to us for a free estimate or to discuss your needs-we're just ten miles from Haywards Heath.

approx. 10 milesDistance from our base · Haywards Heath

Call us+44 7351 026409Email usmorespacesussex@yahoo.com

We serve your areaLewes and the surroundings

The Google map loads after you accept marketing cookies.

Request Your Free Consultation

What Clients Say

01

“Very satisfied with the service! Excellent communication, clean workmanship, and everything completed professionally. Highly recommended!”

Maksymilian Mazur

Review from Google

What we build

Our Building Services

Project Results

Builders at MoreSpace Sussex Ltd deliver finished, practical living spaces tailored to each client's real needs.

Where We Operate

Builders from MoreSpace Sussex Ltd operate within a 40 km radius of Haywards Heath for all projects, from loft conversions and extensions to complete new builds.

Frequently asked questions - Rsj