Extensions · Loft conversions · New builds

Contemporary kitchen extension with island unit, built-in storage, and open-plan living area featuring modern cabinetry and skylights

MoreSpace Sussex Ltd

Rsj in Littlehampton

We supply and install RSJs in Littlehampton according to structural engineer's calculations, including full building control sign-off.

  • On-time, on-budget delivery
  • Clear communication and a fast response
  • One contractor from groundworks to the keys

See our work in person Visit a finished project and talk to past clients

Request Your Free Consultation

Who Needs Structural Steel Work

Opening Up Ground Floor

When planning to knock through a load-bearing wall to create an open-plan kitchen and living space, installing an RSJ in Littlehampton is essential for structural safety. Removing a load-bearing wall without adequate steel support is a risk that Building Control will not approve because that wall performs a critical function. An RSJ substitutes that job, bearing the weight of the upper floor or roof across the new opening. We size and install the beam following the structural engineer's specifications, ensuring the work commences correctly.

Connecting an Extension

Connecting a new extension to the existing house often necessitates an RSJ in Littlehampton to bridge the gap and properly integrate the two structures. This situation frequently arises with single-storey rear and side return extensions, where the original back wall is altered or removed. The RSJ supports the overhead load as the new area is opened up below, and we ensure the connection receives Building Control approval before any further work is completed. This careful approach helps prevent any future cracking or shifting.

Loft and Upper Floor Work

RSJs play a vital role in many loft conversions, providing necessary support for new floor joists and re-distributing the roof loads. In cases such as hip to gable or dormer conversions, the existing roof structure undergoes significant changes, often requiring an RSJ to safely handle the new loads created. We adhere strictly to the structural engineer's specifications, utilizing temporary propping while we fit the beam and conduct the essential Building Control inspections. Although the RSJ remains concealed after the work is complete, its structural integrity is crucial for the entire conversion process.

Contemporary kitchen extension with dark cabinetry, white counters, and full-width patio doors opening to garden

Preparing Your Living Space

Modern kitchen extension with fitted gray cabinets, island and open dining area

Clearing Work Zones

Dust travels fast during demolition. We recommend packing your soft furnishings into plastic crates and taping doorways that lead to your bedrooms. When installing an Rsj in Littlehampton, shifting your dining tables, wall art, and kitchen cupboards out of the direct carry route prevents accidental scuffs. Heavy steel components require clear doorways, level hallways, and unobstructed floor surfaces from the front kerb right through to the back garden.

Handling Existing Services

Hidden services live behind older plaster. You will often find unexpected twin-and-earth cables, central heating pipework, or vertical gas feeds running directly through the masonry zone where the new beam must sit. An electrician and a plumber usually isolate those circuits before steel touches masonry. We coordinate those cut-outs so the trade sequence flows steadily, preventing burst copper lines or live exposed wires while masonry work proceeds.

Advantages of One Team Throughout

  • No Coordination Gaps

    Having the same team install the RSJ and continue with the remainder of the build prevents any oversight. The structural work transitions seamlessly to the next phase without relying on a separate contractor to finish.

  • Structural Work in Context

    Our team recognizes how the RSJ integrates into the broader project, whether it involves an extension, a loft conversion, or opening the ground floor. This knowledge ensures the beam is correctly positioned from the outset, with the remainder of the build designed around it.

  • Building Control Handled

    Installing an RSJ requires Building Control sign-off before concealing the beam, and we oversee that process as part of our responsibilities. There’s no ambiguity regarding who organizes the inspection or what steps to take if adjustments are necessary.

  • Temporary Propping Done Right

    Proper temporary propping is crucial during the RSJ installation; mistakes can jeopardize the structure. Since we manage the entire workflow, the propping remains in place precisely as long as necessary, without pressure from another contractor needing to come in.

  • Making Good Included

    Once the RSJ is installed and passes inspection, our team addresses the wall openings, plasterwork, and finishing touches. You're not left with a secure beam and unrefined finishes that require another party to resolve.

Rendered single-storey extension with large black-framed windows, soffit downlights and a landscaped patio

Structural Problems We Solve Properly

Kitchen extension with modern open-plan design, dark island, dining table, and sliding glass doors to garden

Opening Up Load-Bearing Walls

When removing a ground-floor wall to connect an extension or create a spacious living area, an RSJ installed in Littlehampton bears the weight above. Each RSJ we fit is calculated according to structural engineering plans, with appropriate temporary propping to ensure structural safety while the beam is inserted. Building Control confirms the RSJ’s integrity before any coverings are applied, eliminating concerns about what lies behind the plaster.

Connecting Extensions to Existing Structure

Establishing a connection between a new extension and the original house almost invariably entails structural steelwork. Addressing this connection accurately influences the build's long-term performance. We manage every aspect - propping, RSJ installation, and finishing the surrounding masonry - so the transition from old to new is sound and polished. With 35 years of experience working on house extensions and structural changes throughout Sussex, we fully understand the requirements of these junctions and execute them with precision.

Process From Calculations to Completion

  1. Structural Engineer Calculations

    We collaborate with a structural engineer from the beginning to determine the appropriate RSJ size, specifications, and bearing locations based on your project’s actual span and load requirements.

  2. Temporary Propping Installed

    Before any masonry work begins, we put up temporary propping to safely hold the load during the process. This preserves the structure above and maintains a safe work environment while installing the RSJ.

  3. Opening Up and Beam Placement

    We carefully cut away the masonry to create the new opening, then lift and place the RSJ onto its padstones or steel columns at both ends. The beam is positioned precisely according to the engineer's specifications without shortcuts on bearing lengths or levels.

  4. Building Control Inspection

    We schedule the Building Control inspection at the structural stage, prior to any boxing in or plastering. The RSJ and its supports are approved on site, providing you with a clear record that the work aligns with Building Regulations.

  5. Making Good and Finishing

    After the RSJ receives sign-off, we restore the surrounding masonry, plasterwork, and any impacted finishes. The structural steel becomes integrated into the building’s framework, handing over a space ready for the next construction phase.

Protecting Utilities and Ceiling Voids

Rerouting Water Pipes

Cold mains feeds rarely stay put. When you knock out a spine wall to insert a new girder, central heating flow pipes and waste lines tucked inside that partition require rerouting below joists or through adjacent service voids. Choosing an Rsj in Littlehampton means adjusting the path of radiator feeds before the flange is hoisted into place, keeping the joist structure intact and your boiler working properly throughout.

Wiring Runs and Fireproofing

Bare metal conducts extreme heat during fires. We encase steel sections in double layers of fire-rated plasterboard, or coat them with intumescent paint so structural integrity remains sound in an emergency. Consumer units sometimes sit right beneath the structural opening. Electricians pull those main cables through pre-drilled timber packers alongside the beam webbing, preventing compressed insulation and keeping lighting runs safely separated from raw metal surfaces.

Modern kitchen extension with open-plan dining, black cabinetry, and garden doors

Managing Seasonal Weather and Access

Contemporary kitchen extension with island unit, built-in storage, and open-plan living area featuring modern cabinetry and skylights

Rain and Open Gables

Wet weather changes the pace. During rainy spells, taking down an external flank wall exposes subfloors to immediate damp. We secure heavy tarpaulins across open brickwork cavities before moving an Rsj in Littlehampton into position, keeping exposed floor timbers dry while the bearing padstones cure underneath.

Narrow Coastal Entrances

Access tracks dictate steel dimensions. Terraced properties often feature tight back gates, shared gravel alleys, and overhanging porch roofs that stop a lorry arm from swinging a single long steel section straight indoors. Spliced beams joined with heavy fishplates solve that access puzzle. We walk the route from the road to your rear patio, checking garden turns and low eaves before deliveries arrive.

Cold Mortar Curing

Frost ruins fresh concrete. High-density padstones and structural mortar beds demand temperatures well above freezing to gain full structural strength before taking heavy loads. In freezing winter weather, we enclose the openings with insulated panels and run space heaters near the masonry piers. This controlled heat protects the chemical curing of the bedding mix under the steel bearings.

Let's Talk About Your Structural Project

Done Right From the Start

If you’re planning to open up your ground floor, remove a load-bearing wall, or join a new extension to your home, RSJ installation is a critical task that deserves attention. Every RSJ we install is sized and specified according to structural engineering calculations before any props are set. We execute the work with complete temporary propping in place, ensuring the structure above is adequately supported during every phase.

One Team, No Gaps

Because we handle the structural work in conjunction with the rest of the build, you won’t have to wait for a separate steel contractor to arrive before advancing the remainder of the project. Our team manages the RSJ installation, coordinates Building Control inspections, and ensures the surrounding finishes are tidied once the beam is approved. With 35 years behind us, we know what it takes to get structural work done right while keeping the project on track.

Local contact

Contact in Littlehampton

For local service in Littlehampton, we offer expert installation of RSJs tailored to your needs. Contact us for a free estimate or to discuss your project in detail.

approx. 30 milesDistance from our base · Haywards Heath

Call us+44 7351 026409Email usmorespacesussex@yahoo.com

We serve your areaLittlehampton and the surroundings

The Google map loads after you accept marketing cookies.

Request Your Free Consultation

What Clients Say

01

“Very satisfied with the service! Excellent communication, clean workmanship, and everything completed professionally. Highly recommended!”

Maksymilian Mazur

Review from Google

What we build

Our Building Services

Project Results

Builders at MoreSpace Sussex Ltd deliver finished, practical living spaces tailored to each client's real needs.

Where We Operate

Builders from MoreSpace Sussex Ltd operate within a 40 km radius of Haywards Heath for all projects, from loft conversions and extensions to complete new builds.

Frequently asked questions - Rsj