We supply and install Rsj in Eastbourne based on structural engineer's calculations, ensuring full compliance with building control.

  • On-time, on-budget delivery
  • Clear communication and a fast response
  • One contractor from groundworks to the keys

See our work in person Visit a finished project and talk to past clients

Request Your Free Consultation

Who Needs Structural Steel Work

Opening Up Ground Floor

If you plan to open up a load-bearing wall to create a spacious kitchen and living area, an Rsj in Eastbourne is essential for structural integrity. This wall performs a critical role in the building, and removing it without proper steel support isn't permitted by Building Control. The Rsj will support the load from above, facilitating your new opening. We ensure accurate sizing and installation based on the structural engineer's calculations, so everything is done correctly from the start.

Connecting an Extension

When a new extension connects with your existing home, oftentimes an Rsj in Eastbourne is needed to bridge the gap and stabilize both structures effectively. This is commonly seen in single-storey extensions, where the original wall is altered or taken down. The Rsj holds the weight above, while the new area is opened up below, with Building Control signing off before any plasterwork occurs. Getting this part right eliminates future cracking and shifting.

Loft and Upper Floor Work

Installation of an Rsj is a typical aspect of many loft conversions, where structural steel is required to support newly added floor joists and redistribute the roof's weight. Especially in hip-to-gable or dormer conversions, the original roof structure changes substantially, needing an Rsj or steel frame to safely support new loads. We strictly follow the structural engineer’s specifications, with temporary supports in place as the beam is installed, and we coordinate all Building Control inspections at the appropriate stages. Though hidden once completed, the Rsj is crucial for the overall integrity of your conversion.

Modern kitchen extension with fitted gray cabinets, island and open dining area

What Rsj Installation Covers

Modern kitchen extension with open-plan dining, black cabinetry, and garden doors

Structural Steel Supply

Our Rsj installation encompasses supplying and fitting rolled steel joists wherever there's a need to remove a load-bearing wall or create a new opening. Every Rsj we install is sized precisely as per the structural engineer's calculations, ensuring the beam handles exactly what it should - no guesswork needed. We manage temporary supports throughout the project to maintain safety while the Rsj is fitted, with building control sign-off included as standard before any finishes are applied.

Making Good Afterwards

Once the Rsj is installed and approved, we take care of all final touches as part of the same job - this includes patching, plastering, and completing the surrounding area to ensure everything blends seamlessly with the rest of the project. There’s no handoff to another team and no delays between structural work and finishing touches. Whether the Rsj serves to connect a new extension or create an open-plan ground floor layout, we handle the entire process from start to finish.

Benefits of One Team Throughout the Project

  • No Coordination Gaps

    When our team manages both the Rsj installation and the subsequent building work, everything flows smoothly without oversight. The structural elements are integrated directly into the next phase, eliminating delays waiting for another contractor.

  • Understanding the Bigger Picture

    We grasp how the Rsj fits into the overall project, be it an extension, a loft conversion, or opening up a ground floor. This means the beam is set correctly from day one, with other construction planned appropriately around it.

  • Building Control Taken Care Of

    Installing an Rsj requires the necessary building control approvals before it’s concealed, and we manage that part of the work. You’ll know exactly who arranges inspections and what adjustments might be needed.

  • Proper Temporary Propping

    Implementing correct temporary propping during Rsj installation is crucial, as mistakes could jeopardize the structure. We oversee the entire sequence of work, ensuring supports stay in place precisely as long as necessary, without pressure from outside trades.

  • Final Touches Included

    After the Rsj is installed and signed off, we handle all repairs to the wall openings, plasterwork, and surrounding finishes. You won’t be left with a structurally sound beam and unfinished work that needs a separate team.

Rendered single-storey extension with large black-framed windows, soffit downlights and a landscaped patio

Preparing Your Living Space Early

Kitchen extension with modern open-plan design, dark island, dining table, and sliding glass doors to garden

Clearing Out The Furniture

Dust travels fast during masonry cutting. We recommend moving soft furnishings, picture frames, and electronics into adjacent rooms long before the structural steel arrives on site. Sealing interior doorways with heavy polythene sheeting stops fine grit from settling across your carpets. When fitting an Rsj Eastbourne homeowners quickly realise that clear corridors make manoeuvring heavy metal sections far safer, protecting delicate skirting boards from accidental scuffs.

Protecting Subfloors And Joists

Floorboards take serious pressure under heavy concentrated weights. You should strip back loose carpets and lay down thick plywood sheets over the bare timber before any heavy load arrives. When installing an Rsj across older floor structures, pinpointing the exact paths of existing central heating pipes and mains cables prevents sudden puncturing accidents. A stray screw hitting a buried copper feed causes messy water damage, stopping the entire masonry alteration immediately.

Our Process: From Plans to Completion

  1. Calculations by Structural Engineers

    We collaborate with a structural engineer from the very beginning to determine the precise Rsj size, specifications, and bearing points based on your project's span and load demands.

  2. Temporary Supports Installed

    Before any brickwork begins, we put in temporary supports to safely bear the load during the project. This keeps everything secure while the Rsj installation moves forward.

  3. Creating New Openings and Beam Setting

    Carefully, we remove masonry to form the new opening, then raise and place the Rsj onto its supports at either end. The beam is adjusted exactly to the engineer's drawings, free from shortcuts regarding bearing lengths or levels.

  4. Conducting Building Control Inspections

    We take charge of scheduling the Building Control inspection at the structural phase, ensuring that everything is checked before it's covered up or plastered. The Rsj and supports get signed off at the site, providing you with documentation showing compliance with Building Regulations.

  5. Completing Final Touches

    Once the Rsj gets approved, we restore the surrounding masonry, plaster, and any impacted finishes. The structural steel becomes invisible as it's embedded within the building's fabric, ready for the next phase of construction.

Managing Utilities Around Structural Openings

Rerouting Hidden Cables

Electricians must isolate ring mains before knock-throughs begin. Dropping an internal partition usually exposes junction boxes, light switches, and alarm feeds buried deep inside old lime mortar. During an Rsj Eastbourne project, we coordinate wire diversions around the new steel flange so plasterers can tuck everything neatly out of sight later. Leaving live wires hanging loose under exposed timber introduces severe fire hazards, especially when steelwork shifts into its final pocket.

Plumbing Pipes And Gas

Vertical pipework rarely sits where modern open plans need it to be. Water supply lines feeding upstairs bathrooms or copper gas conduits serving kitchen hobs must be cut back and rerouted through adjacent floor voids before resting any Rsj onto masonry padstones. If a heavy girder pinches a soft copper line against brickwork, the resulting pinhole leak might stay hidden behind fresh plaster for months, slowly soaking your ceiling timbers.

Contemporary kitchen extension with dark cabinetry, white counters, and full-width patio doors opening to garden

Avoiding Everyday Structural Installation Pitfalls

Contemporary kitchen extension with island unit, built-in storage, and open-plan living area featuring modern cabinetry and skylights

Wrong Padstone Sizing

Never place bare metal directly on soft brickwork. Doing this crushes porous clay bricks, causing deep diagonal fractures across the ceiling above. Pouring dense concrete pads spreads the immense point load sideways into existing party walls. When selecting an Rsj Eastbourne renovators occasionally overlook how crumbly historic lime joints react beneath concentrated loads.

Ignoring Thermal Bridging

Cold steel draws interior moisture straight out of warm domestic air. Uninsulated metal beams touching an exterior cavity wall create persistent cold spots, encouraging black mould patches to bloom along fresh paintwork. Wrapping the Rsj with rigid foil-faced insulation boards eliminates internal sweating before the dryliners fix double-layer fireboard over the casing.

Rushing Fresh Mortar Curing

Patience protects your upper walls from sudden movement. Loading heavy steel onto fresh wet cement causes unpredictable settling, cracking bathroom tiles on the storey directly above. We always let bedding mortar harden thoroughly before removing steel props from underneath the main beam. Tiny shifts loosen door frames permanently.

Discuss Your Structural Project with Us

Done Correctly From the Start

If you’re planning to create an open ground floor, take down a load-bearing wall, or connect an extension to your house, installing an Rsj is vital and should not be underestimated. Every Rsj we install is sized according to a structural engineer’s calculations before we even start with temporary supports. We manage the work with full props throughout, ensuring that the structure above remains adequately supported at all times.

One Team, No Delays

By having our team handle both the structural work and the overall building, there's no waiting for a steel contractor before continuing the project. We facilitate the Rsj installation, manage building control inspections, and complete all finishes once the beam is signed off. With decades of experience, we know precisely what’s required to execute the structural work efficiently and keep your project on track.

Local contact

Contact in Eastbourne

Contact in Eastbourne: We operate throughout Eastbourne and its surroundings. Reach out for a phone consultation, a free estimate, or to set up a site visit. We are roughly 30 miles from our base in Haywards Heath.

approx. 30 milesDistance from our base · Haywards Heath

Call us+44 7351 026409Email usmorespacesussex@yahoo.com

We serve your areaEastbourne and the surroundings

The Google map loads after you accept marketing cookies.

Request Your Free Consultation

What Clients Say

01

“Very satisfied with the service! Excellent communication, clean workmanship, and everything completed professionally. Highly recommended!”

Maksymilian Mazur

Review from Google

What we build

Our Building Services

Project Results

Builders at MoreSpace Sussex Ltd deliver finished, practical living spaces tailored to each client's real needs.

Where We Operate

Builders from MoreSpace Sussex Ltd operate within a 40 km radius of Haywards Heath for all projects, from loft conversions and extensions to complete new builds.

Frequently asked questions - Rsj